Yes, the result of the feasibility study is always check both the fact that the program fits and if the number of people is compatible with the legal constraints.

Of course this means that we should get this informations as soon as possible when we are doing the building analysis.

When you apply a flex ratio (0.8 for example), the system will tell you if a program fits both in size and number of people allowed in the building and if it will be ok if everyone comes the same day (for a town hall meeting for example).